---
title: "Low Heat Non-Fat Dried Milk Powder - plastic totes (NTE) 2200 lbs. (packed un... — FDA record H-0698-2026 | Is It on Recall"
description: "Potential contamination with Salmonella."
url: https://isitonrecall.com/recall/fda-food-h-0698-2026-low-heat-non-fat-dried-milk-powder-plastic-totes-nte-2200-lbs-packed-under-5-labels-off-grade-nfdm-v/
updated: 2026-10-01
site: "Is It on Recall"
language: en
---

[Recall archive](https://isitonrecall.com/archives/) / FDA food enforcement

# Low Heat Non-Fat Dried Milk Powder - plastic totes (NTE) 2200 lbs. (packed under 5 labels: Off Grade NFDM Variable; G... — FDA record H-0698-2026

Reported ongoing

Status as reported in the agency record. FDA warns that enforcement status may not track the current recall lifecycle; check the current official notice.

Source date Apr 20, 2026. Retrieved Oct 1, 2026. Last updated Oct 1, 2026.

Archive changed Oct 1, 2026. USDA FSIS records are unavailable; [check FSIS directly](https://www.fsis.usda.gov/recalls). [Source coverage and dates](https://isitonrecall.com/sources/).

## What the record says

- **Product**: Low Heat Non-Fat Dried Milk Powder - plastic totes (NTE) 2200 lbs. (packed under 5 labels: Off Grade NFDM Variable; Grade A NFDM LH Basic; Grade A NFDM LH Green Loop rBST Free; Grade A NFDM LH Standard NC rBST Free; NFDM LH Variable Standard)
- **Reason**: Potential contamination with Salmonella.
- **Classification**: Class I
- **Recalling firm**: California Dairies Inc.
- **Quantity**: 1,110,564 lbs.
- **Agency-reported status**: Ongoing
- **Source record identifier**: H-0698-2026

[Open the official record](https://api.fda.gov/food/enforcement.json?search=recall_number%3A%22H-0698-2026%22)

[What the recall classes mean](https://isitonrecall.com/guides/recall-classes/). Classification is an agency assessment, not individual medical advice.

## Lot and product identifiers

| Label field | Details supplied by the agency |
| --- | --- |
| Lot, code or applicability | Batch Codes for recalled product all start with A or B full list below. Batch Code and Production Date: B22625-01-1 8/14/2025; B22625-01-2 8/14/2025; B22625-01-3 8/14/2025; B22625-01-4 8/14/2025; B22625-01-5 8/14/2025; B22625-01-6 8/14/2025; B22625-01-7 8/14/2025; B22625-01-8 8/14/2025; B22625-02-1 8/14/2025; B22625-02-2 8/14/2025; B22625-02-3 8/14/2025; B22625-02-4 8/14/2025; B22625-02-5 8/14/2025; B22625-02-6 8/14/2025; B22625-02-7 8/14/2025; B22625-02-8 8/14/2025; B22625-03-1 8/14/2025; B22625-03-2 8/14/2025; B22625-03-3 8/14/2025; B22625-03-4 8/14/2025; B22625-03-5 8/14/2025; B22625-03-6 8/14/2025; B22625-03-7 8/14/2025; B22625-03-8 8/14/2025; B22625-04-1 8/14/2025; B22625-04-2 8/14/2025; B22625-04-3 8/14/2025; B22625-04-4 8/14/2025; B22625-04-5 8/14/2025; B22625-04-6 8/14/2025; B22625-04-7 8/14/2025; B22625-04-8 8/14/2025; B22625-05-1 8/14/2025; B22625-05-2 8/14/2025; B22625-05-3 8/14/2025; B22625-05-4 8/14/2025; B22625-05-5 8/14/2025; B22625-05-6 8/14/2025; B22625-05-7 8/14/2025; B22625-05-8 8/14/2025; B22625-06-1 8/14/2025; B22625-06-2 8/14/2025; B22625-06-3 8/14/2025; B22625-06-4 8/14/2025; B22625-06-5 8/14/2025; B22625-06-6 8/14/2025; B22625-06-7 8/14/2025; B22625-06-8 8/14/2025; B22625-07-1 8/14/2025; B22625-07-2 8/14/2025; B22625-07-3 8/14/2025; B22625-07-4 8/14/2025; B22625-07-5 8/14/2025; B22625-07-6 8/14/2025; B22625-07-7 8/14/2025; B22625-07-8 8/14/2025; B22625-08-1 8/14/2025; B22625-08-2 8/14/2025; B22625-08-3 8/14/2025; B22625-08-4 8/14/2025; B22625-08-5 8/14/2025; B22625-08-6 8/14/2025; B22625-08-7 8/14/2025; B22625-08-8 8/14/2025; B22625-09-1 8/14/2025; B22625-09-2 8/14/2025; B22625-09-3 8/14/2025; B22625-09-4 8/14/2025; B22625-09-5 8/14/2025; B22625-09-6 8/14/2025; B22625-09-7 8/14/2025; B22625-10-1 8/14/2025; B22625-10-2 8/14/2025; B22625-10-3 8/14/2025; B22625-10-4 8/14/2025; B22625-10-5 8/14/2025; B22625-10-6 8/14/2025; B22625-10-7 8/14/2025; B22625-10-8 8/14/2025; B22625-11-1 8/14/2025; B22625-11-2 8/14/2025; B22625-11-3 8/14/2025; B22625-11-4 8/14/2025; B22625-11-5 8/14/2025; B22625-11-6 8/14/2025; B22625-11-7 8/14/2025; B22625-11-8 8/14/2025; B22625-12-1 8/14/2025; B22625-12-2 8/14/2025; B22625-12-3 8/14/2025; B22625-12-4 8/14/2025; B22625-12-5 8/14/2025; B22625-12-6 8/14/2025; B22625-12-7 8/14/2025; B22625-12-8 8/14/2025; B22625-13-1 8/14/2025; B22625-13-2 8/14/2025; B22625-13-3 8/14/2025; B22625-13-4 8/14/2025; B22625-13-5 8/14/2025; B22625-13-6 8/14/2025; B22625-13-7 8/14/2025; B22625-13-8 8/14/2025; B22725-02-1 8/15/2025; B22725-02-2 8/15/2025; B22725-02-3 8/15/2025; B22725-02-4 8/15/2025; B22725-02-5 8/15/2025; B22725-02-6 8/15/2025; B22725-02-7 8/15/2025; B22725-02-8 8/15/2025; B22725-03-1 8/15/2025; B22725-03-2 8/15/2025; B22725-03-3 8/15/2025; B22725-03-4 8/15/2025; B22725-03-5 8/15/2025; B22725-03-6 8/15/2025; B22725-03-7 8/15/2025; B22725-03-8 8/15/2025; B22725-04-1 8/15/2025; B22725-04-2 8/15/2025; B22725-04-3 8/15/2025; B22725-04-4 8/15/2025; B22725-04-5 8/15/2025; B22725-04-6 8/15/2025; B22725-04-7 8/15/2025; B22725-04-8 8/15/2025; B22725-05-1 8/15/2025; B22725-05-2 8/15/2025; B22725-05-3 8/15/2025; B22725-05-4 8/15/2025; B22725-05-5 8/15/2025; B22725-05-6 8/15/2025; B22725-05-7 8/15/2025; B22725-05-8 8/15/2025; B22725-06-1 8/15/2025; B22725-06-2 8/15/2025; B22725-06-3 8/15/2025; B22725-06-4 8/15/2025; B22725-06-5 8/15/2025; B22725-06-6 8/15/2025; B22725-06-7 8/15/2025; B22725-06-8 8/15/2025; B22725-07-1 8/15/2025; B22725-07-2 8/15/2025; B22725-07-6 8/15/2025; B22725-07-7 8/15/2025; B22725-07-8 8/15/2025; B22725-08-1 8/15/2025; B22725-08-2 8/15/2025; B22725-08-3 8/15/2025; B22725-08-4 8/15/2025; B22725-08-5 8/15/2025; B22725-08-6 8/15/2025; B22725-08-7 8/15/2025; B22725-08-8 8/15/2025; B22725-09-1 8/15/2025; B22725-09-2 8/15/2025; B22725-09-3 8/15/2025; B22725-09-4 8/15/2025; B22725-09-5 8/15/2025; B22725-09-6 8/15/2025; B22725-09-7 8/15/2025; B22725-09-8 8/15/2025; B22825-01-1 8/16/2025; B22825-01-2 8/16/2025; B22825-01-3 8/16/2025; B22825-01-4 8/16/2025; B22825-01-5 8/16/2025; B22825-01-6 8/16/2025; B22825-01-7 8/16/2025; B22825-01-8 8/16/2025; B22825-02-1 8/16/2025; B22825-02-2 8/16/2025; B22825-02-3 8/16/2025; B22825-02-4 8/16/2025; B22825-02-5 8/16/2025; B22825-02-6 8/16/2025; B22825-02-7 8/16/2025; B22825-02-8 8/16/2025; B22825-03-1 8/16/2025; B22825-03-2 8/16/2025; B22825-03-3 8/16/2025; B22825-03-4 8/16/2025; B22825-03-5 8/16/2025; B22825-03-6 8/16/2025; B22825-03-7 8/16/2025; B22825-03-8 8/16/2025; B22825-04-1 8/16/2025; B22825-04-2 8/16/2025; B22825-04-3 8/16/2025; B22825-04-4 8/16/2025; B22825-04-5 8/16/2025; B22825-04-6 8/16/2025; B22825-04-7 8/16/2025; B22825-04-8 8/16/2025; B22825-05-1 8/16/2025; B22825-05-2 8/16/2025; B22825-05-3 8/16/2025; B22825-05-4 8/16/2025; B22825-05-5 8/16/2025; B22825-05-6 8/16/2025; B22825-05-7 8/16/2025; B22825-05-8 8/16/2025; B22825-06-1 8/16/2025; B22825-06-2 8/16/2025; B22825-06-3 8/16/2025; B22825-06-4 8/16/2025; B22825-06-5 8/16/2025; B22825-06-6 8/16/2025; B22825-06-7 8/16/2025; B22825-06-8 8/16/2025; B22825-07-1 8/16/2025; B22825-07-2 8/16/2025; B22825-07-3 8/16/2025; B22825-07-4 8/16/2025; B22825-07-5 8/16/2025; B22825-07-6 8/16/2025; B22825-07-7 8/16/2025; B22825-07-8 8/16/2025; B22825-08-1 8/16/2025; B22825-08-2 8/16/2025; B22825-08-3 8/16/2025; B22825-08-4 8/16/2025; B22825-08-5 8/16/2025; B22825-08-6 8/16/2025; B22825-08-7 8/16/2025; B22825-08-8 8/16/2025; B22825-09-1 8/16/2025; B22825-09-2 8/16/2025; B22825-09-3 8/16/2025; B22825-09-4 8/16/2025; B22825-09-5 8/16/2025; B22825-09-6 8/16/2025; B22825-09-7 8/16/2025; B22825-09-8 8/16/2025; B22825-10-1 8/16/2025; B22825-10-2 8/16/2025; B22825-10-3 8/16/2025; B22825-10-4 8/16/2025; B22825-10-5 8/16/2025; B22825-10-6 8/16/2025; B22825-10-7 8/16/2025; B22825-10-8 8/16/2025; B22825-11-1 8/16/2025; B22825-11-2 8/16/2025; B22825-11-3 8/16/2025; B22825-11-4 8/16/2025; B22825-11-5 8/16/2025; B22825-11-6 8/16/2025; B22825-11-7 8/16/2025; B22825-11-8 8/16/2025; B22825-12-1 8/16/2025; B22825-12-2 8/16/2025; B22825-12-3 8/16/2025; B22825-12-4 8/16/2025; B22825-12-5 8/16/2025; B22825-12-6 8/16/2025; B22825-12-7 8/16/2025; B22825-12-8 8/16/2025; B22925-01-1 8/17/2025; B22925-01-2 8/17/2025; B22925-01-3 8/17/2025; B22925-01-4 8/17/2025; B22925-01-5 8/17/2025; B22925-01-6 8/17/2025; B22925-01-7 8/17/2025; B22925-01-8 8/17/2025; B22925-02-1 8/17/2025; B22925-02-2 8/17/2025; B22925-02-3 8/17/2025; B22925-02-4 8/17/2025; B22925-02-5 8/17/2025; B22925-02-6 8/17/2025; B22925-02-7 8/17/2025; B22925-02-8 8/17/2025; B22925-03-1 8/17/2025; B22925-03-2 8/17/2025; B22925-03-3 8/17/2025; B22925-03-4 8/17/2025; B22925-03-5 8/17/2025; B22925-03-6 8/17/2025; B22925-03-7 8/17/2025; B22925-03-8 8/17/2025; B22925-04-1 8/17/2025; B22925-04-2 8/17/2025; B22925-04-3 8/17/2025; B22925-04-4 8/17/2025; B22925-04-5 8/17/2025; B22925-04-6 8/17/2025; B22925-04-7 8/17/2025; B22925-04-8 8/17/2025; B22925-05-1 8/17/2025; B22925-05-2 8/17/2025; B22925-05-3 8/17/2025; B22925-05-4 8/17/2025; B22925-05-5 8/17/2025; B22925-05-6 8/17/2025; B22925-05-7 8/17/2025; B22925-05-8 8/17/2025; B22925-06-1 8/17/2025; B22925-06-2 8/17/2025; B22925-06-3 8/17/2025; B22925-06-4 8/17/2025; B22925-06-5 8/17/2025; B22925-06-6 8/17/2025; B22925-06-7 8/17/2025; B22925-06-8 8/17/2025; B22925-07-1 8/17/2025; B22925-07-2 8/17/2025; B22925-07-3 8/17/2025; B22925-07-4 8/17/2025; B22925-07-5 8/17/2025; B22925-07-6 8/17/2025; B22925-07-7 8/17/2025; B22925-07-8 8/17/2025; B22925-08-1 8/17/2025; B22925-08-2 8/17/2025; B22925-08-3 8/17/2025; B22925-08-4 8/17/2025; B22925-08-5 8/17/2025; B22925-08-6 8/17/2025; B22925-08-7 8/17/2025; B22925-08-8 8/17/2025; B22925-09-1 8/17/2025; B22925-09-2 8/17/2025; B22925-09-3 8/17/2025; B22925-09-4 8/17/2025; B22925-09-5 8/17/2025; B22925-09-6 8/17/2025; B22925-09-7 8/17/2025; B22925-09-8 8/17/2025; B22925-10-1 8/17/2025; B22925-10-2 8/17/2025; B22925-10-3 8/17/2025; B22925-10-4 8/17/2025; B22925-10-5 8/17/2025; B22925-10-6 8/17/2025; B22925-10-7 8/17/2025; B22925-10-8 8/17/2025; A32325-01-1 11/19/2025; A32325-01-2 11/19/2025; A32325-01-3 11/19/2025; A32325-05-1 11/19/2025; A32325-05-2 11/19/2025; A32325-05-3 11/19/2025; A32325-05-4 11/19/2025; A32325-05-5 11/19/2025; A32325-05-6 11/19/2025; A32325-05-7 11/19/2025; A32325-05-8 11/19/2025; A32325-06-1 11/19/2025; A32325-06-2 11/19/2025; A32325-06-3 11/19/2025; A32325-06-4 11/19/2025; A32325-06-5 11/19/2025; A32325-06-6 11/19/2025; A32325-06-7 11/19/2025; A32325-06-8 11/19/2025; A32325-07-1 11/19/2025; A32325-07-2 11/19/2025; A32325-07-3 11/19/2025; A32325-07-5 11/19/2025; A32325-07-6 11/19/2025; A32325-07-7 11/19/2025; A32325-07-8 11/19/2025; A32425-02-1 11/20/2025; A32425-02-2 11/20/2025; A32425-04-3 11/20/2025; B32525-01-1 11/21/2025; B32525-01-2 11/21/2025; B32525-01-3 11/21/2025; B32525-01-4 11/21/2025; B32525-01-5 11/21/2025; B32525-01-6 11/21/2025; B32525-01-7 11/21/2025; B32525-01-8 11/21/2025; B32525-02-1 11/21/2025; B32525-02-2 11/21/2025; B32525-02-3 11/21/2025; B32525-02-4 11/21/2025; B32525-02-5 11/21/2025; B32525-02-6 11/21/2025; B32525-02-7 11/21/2025; B32525-02-8 11/21/2025; B32525-03-1 11/21/2025; B32525-03-2 11/21/2025; B32525-03-3 11/21/2025; B32525-03-4 11/21/2025; B32525-03-5 11/21/2025; B32525-03-6 11/21/2025; B32525-03-7 11/21/2025; B32525-03-8 11/21/2025; B32525-04-4 11/21/2025; B32525-05-1 11/21/2025; B32525-05-2 11/21/2025; B32525-05-3 11/21/2025; B32525-05-4 11/21/2025; B32525-05-5 11/21/2025; B32525-05-6 11/21/2025; B32525-05-7 11/21/2025; B32525-05-8 11/21/2025; B32525-06-1 11/21/2025; B32525-06-2 11/21/2025; B32525-06-3 11/21/2025; B32525-06-4 11/21/2025; B32525-06-5 11/21/2025; B32525-06-6 11/21/2025; B32525-06-7 11/21/2025; B32525-06-8 11/21/2025; B32525-07-1 11/21/2025; B32525-07-3 11/21/2025; B32525-07-8 11/21/2025; B32525-08-1 11/21/2025; B32525-08-2 11/21/2025; B32525-08-3 11/21/2025; B32525-08-4 11/21/2025; B32525-08-5 11/21/2025; B32525-08-6 11/21/2025; B32525-08-7 11/21/2025; B32525-08-8 11/21/2025; B32525-09-1 11/21/2025; B32525-09-2 11/21/2025; B32525-09-3 11/21/2025; B32525-09-4 11/21/2025; B32525-09-5 11/21/2025; B32525-09-6 11/21/2025; B32525-09-7 11/21/2025; B32525-09-8 11/21/2025; B32525-10-1 11/21/2025; B32525-10-2 11/21/2025; B32525-10-3 11/21/2025; B32525-10-4 11/21/2025; B32525-10-5 11/21/2025; B32525-10-6 11/21/2025; B32525-10-7 11/21/2025; B32525-10-8 11/21/2025; B32525-11-1 11/21/2025; B32525-11-2 11/21/2025; B32525-11-4 11/21/2025; B32525-12-4 11/21/2025; B32525-12-5 11/21/2025; B32525-12-6 11/21/2025; B32525-12-7 11/21/2025; B32525-12-8 11/21/2025; B32525-13-1 11/21/2025; B32525-13-2 11/21/2025; B32525-13-3 11/21/2025; B32525-13-4 11/21/2025; B32525-13-5 11/21/2025; B32525-13-6 11/21/2025; B32525-13-7 11/21/2025; B32525-13-8 11/21/2025; B32525-14-1 11/21/2025; B32525-14-2 11/21/2025; B32525-14-3 11/21/2025; B32525-14-4 11/21/2025; B32525-14-5 11/21/2025; B32625-01-1 11/22/2025; B32625-01-2 11/22/2025; B32625-01-3 11/22/2025; B32625-01-4 11/22/2025; B32625-01-5 11/22/2025; B32625-01-6 11/22/2025; B32625-01-7 11/22/2025; B32625-01-8 11/22/2025; B32625-02-1 11/22/2025; B32625-02-2 11/22/2025; B32625-02-3 11/22/2025; B32625-02-4 11/22/2025; B32625-02-5 11/22/2025; B32625-02-6 11/22/2025; B32625-02-7 11/22/2025; B32625-02-8 11/22/2025; B32625-03-1 11/22/2025; B32625-03-2 11/22/2025; B32625-03-3 11/22/2025; B32625-03-4 11/22/2025; B32625-03-5 11/22/2025; B32625-03-6 11/22/2025; B32625-03-7 11/22/2025; B32625-03-8 11/22/2025; B32625-04-1 11/22/2025; B32625-04-2 11/22/2025; B32625-04-3 11/22/2025; B32625-05-3 11/22/2025; B32625-05-4 11/22/2025; B32625-05-5 11/22/2025; B32625-05-6 11/22/2025; B32625-05-7 11/22/2025; B32625-05-8 11/22/2025; B32625-06-1 11/22/2025; B32625-06-2 11/22/2025; B32625-06-3 11/22/2025; B32625-06-4 11/22/2025; B32625-06-5 11/22/2025; B32625-06-6 11/22/2025; B32625-06-7 11/22/2025; B32625-06-8 11/22/2025; A32625-07-1 11/22/2025; A32625-07-2 11/22/2025; A32625-07-3 11/22/2025; A32625-07-4 11/22/2025; A32625-07-5 11/22/2025; A32625-07-6 11/22/2025; A32625-07-7 11/22/2025; A32625-07-8 11/22/2025; A32625-08-1 11/22/2025; A32625-08-2 11/22/2025; A32625-08-3 11/22... |

The agency lot list is longer than this excerpt. [Read the complete list at the official source](https://api.fda.gov/food/enforcement.json?search=recall_number%3A%22H-0698-2026%22).

Match all identifying details in the current notice. A brand name alone is not enough.

## Distribution

U.S. Distribution: Unknown and to be determined during RAC assignment. Domestic consignees pick-up product from CDI. Foreign Distribution: Mexico, Philippines, Dominican Republic.

No US distribution state could be established from this record. Check the official notice.

## Dates in the source

- **Report date**: May 13, 2026
- **Recall initiation date**: Apr 20, 2026
- **Center classification date**: May 5, 2026

FDA company pages use the listing date; enforcement records use initiation dates; CPSC uses recall date; NHTSA uses report-received date. These dates are not interchangeable.

## What to do next

Read the official notice for the action that applies to your exact product.

[Read the current instructions](https://api.fda.gov/food/enforcement.json?search=recall_number%3A%22H-0698-2026%22)

## Related records

[Milk records](https://isitonrecall.com/product/milk/) [Dairy and eggs records](https://isitonrecall.com/category/dairy-and-eggs/) [California Dairies Inc. records](https://isitonrecall.com/brand/california-dairies-inc/)
